
INSTALLATION MANUALFOR INSTALLERCONTENTS1. BEFORE INSTALLATION ...22. OUT
10MXZ-4B_5BVA-A1 JG79A313H01.indd 10 2009/10/13 10:18:24
11MXZ-4B_5BVA-A1 JG79A313H01.indd 11 2009/10/13 10:18:24
HEADOFFICE:TOKYOBLDG.,2-7-3,MARUNOUCHI,CHIYODA-KU,TOKYO100-8310,JAPANJG79A313H01MXZ-4B_5BVA-A1 JG79A313H01.indd 12 2009/10/13 10:18:24
21. BEFORE INSTALLATION1-1. THE FOLLOWING SHOULD ALWAYS BE OBSERVED FOR SAFETY• Be sure to read “THE FOLLOWING SHOULD ALWAYS BE OBSERVED FOR SAFETY”
32. Front (blowing) side openAs long as space like the one showninthegurecanbemaintained, it does not mat-ter if there are obstacles in three d
41-6. INSTALLATION DIAGRAMUnitsshouldbeinstalledbylicensedcontractoraccordingtolocalcoderequirements.Aftertheleaktest,applyinsulat-ing
52. OUTDOOR UNIT INSTALLATION2-1. INSTALLING THE UNITFix here with M10 bolts.Make the setting depth deeper.Make with wider.Anchor leg25 or lessAnchor
6Fig. 1 Fig. 2Fig. 3 Fig. 4Fig. 5 Fig. 63. FLARING WORK AND PIPE CONNECTION3-1. FLARING WORKPipe diameter (mm)Nut (mm)A (mm) Tightening torqueClutch
74-3. LOCKING THE OPERATION MODE OF THE AIR CONDITIONER (COOL, DRY, HEAT)4-4. LOWERING THE OPERATION NOISE OF THE OUTDOOR UNIT4-2. GAS CHARGEPerform g
84-6. TEST RUN• Be sure to perform the test run for each unit. Make sure each indoor unit op-eratesproperlyfollowingtheinstallationmanualattach
9MXZ-4B_5BVA-A1 JG79A313H01.indd 9 2009/10/13 10:18:24
Commenti su questo manuale