INSTALLATION MANUAL
FOR INSTALLER
CONTENTS
1. BEFORE INSTALLATION ..............................................................................2
2. OUTDOOR UNIT INSTALLATION .................................................................5
3. FLARING WORK AND PIPE CONNECTION .................................................7
4. PURGING PROCEDURES, LEAK TEST, AND TEST RUN ...........................8
Split-type Air-Conditioner
MXZ-2A20NA
English
Refer to the installation manual of each indoor unit for indoor unit in-
stallation.
ATTENTION
This manual mentions how to install only the outdoor unit MXZ-2A20NA.
As for the way of installation for indoor unit, please refer to the installation manual
being attached each indoor unit.
The installation manual details the suggested installation method.
Any structural alterations necessary for installation must comply with local building
code requirements.
Español
Français
JG79A039H01_En.indd 1 5/9/2008 2:23:40 PM
Vedere la pagina 0
1 2 3 4 5 6 7 8 9

Sommario

Pagina 1 - Split-type Air-Conditioner

INSTALLATION MANUALFOR INSTALLERCONTENTS1. BEFORE INSTALLATION ...22. OUT

Pagina 2 - 1. BEFORE INSTALLATION

21. BEFORE INSTALLATION1-1. THE FOLLOWING SHOULD ALWAYS BE OBSERVED FOR SAFETY• Be sure to read “THE FOLLOWING SHOULD ALWAYS BE OBSERVED FOR SAFETY”

Pagina 3 - Service space

32. Front (blowing) side openAs long as space like the one showninthegurecanbemaintained, it does not mat-ter if there are obstacles in three d

Pagina 4 - 1-6. INSTALLATION DIAGRAM

41-6. INSTALLATION DIAGRAMUnitsshouldbeinstalledbylicensedcontractoraccordingtolocalcoderequirements.Aftertheleaktest,applyinsulat-ing

Pagina 5 - 2. OUTDOOR UNIT INSTALLATION

52. OUTDOOR UNIT INSTALLATION2-1. CONNECTING WIRES FOR OUTDOOR UNIT• Be sure to use special circuits for room air conditioner.• Wiring work should

Pagina 6 - 3-1. FLARING WORK

63. FLARING WORK AND PIPE CONNECTION3-1. FLARING WORKPipe diameter [mm(inch)]Nut (mm)A[mm(inch)] Tightening torqueClutchtypetool for R410AClut

Pagina 7 - 4-2.GASCHARGE

74-1.PURGINGPROCEDURESANDLEAKTESTStop valve for GASStop valve cap(Torque 19.6 to 29.4 N•m, 200 to 300 kgf•cm, 15 to22 ft•lb)Gauge manifold valve

Pagina 8 - 4-4.EXPLANATIONTOTHEUSER

84-3.TESTRUN• Besuretoperformthetestrunforeachunit.Makesureeachindoorunitoperatesproperlyfollowingtheinstallationmanualattache

Pagina 9 - JG79A039H01

HEAD OFFICE: TOKYO BLDG., 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPANJG79A039H01JG79A039H01_cover4.indd 2 5/9/2008 2:23:16 PM